Anderson County construction projects updates:

The contractor is scheduled to continue work on roadway elements. The speed limit has been reduced to 60 mph throughout the project limits. Motorists should use caution when traveling through the project and expect lane closures and delays. Project consists of widening for a Super 2, including sub-grade work, surface treatment, base and surface hot mix asphalt, widening structures, bridge rail, MBGF, signage and permanent striping.

Cherokee County Jacksonville crews will be performing ditch maintenance on SH 110 on Monday between FM 22 and US 84. Tuesday they will be edge sealing FM 1911 from US 69 east to the county line. The rest of the week the crew will be edge sealing on FM 343 from US 69 east to the county line. Traffic will be controlled by flaggers and a pilot car. Rusk crews will be performing base repair on various roadways throughout the county with traffic controlled by flaggers.

Cherokee County construction projects updates:

FM 22 Safety Widening and Bridge Replacement Project 

The contractor is scheduled to continue corrective work and construction on the bridge at Little Turnpike Creek. Flaggers will be present during construction hours. Expect daily lane closures when work is being done. The bridge will be closed during construction. The project will widen the existing roadway, replace three bridges and incorporate safety upgrades.

The contractor is scheduled to continue widening cross structures and driveway upgrades. The contractor also plans to begin widening the travel lanes. Lane closures will be in place. Expect delays on this corridor when construction is in progress. The project will widen and resurface the roadway, along with adding safety upgrades.

No work is scheduled this week. No lane closures will be in place. The project widens the existing roadway and incorporates safety upgrades.

County Road Bridge Replacement Project 

No work is scheduled on CR 3203 and CR 1504. Both roadways are open to traffic. Construction of the new bridges is ongoing on CR 2905 and CR 2614. Both roads are closed to through traffic. The project is replacing the existing bridges at each location with new structures.

The contractor is scheduled to place rock rip rap and fill drop-offs along pavement edges. Lane closures will be in place during construction. The project adds passing lanes and incorporates safety upgrades.

The contractor is awaiting final punch list. Lane closures will be in place, expect delays on this corridor when construction is in progress. The work zone speed limit is 60 mph. The project will rebuild the roadway pavement and upgrade bridge rails.

The contractor is scheduled to continue road work construction on driveway upgrades and structure extensions. Lane closures are anticipated during construction. The project will consist of pavement resurfacing.

The contractor will be installing conduit and cable at US 69 and Cherokee and will be installing signal poles at US 69 and SH 135. Traffic control will consist of occasional lane closures and work outside of the roadway when the work is in progress (Monday-Thursdays, weather permitting). This is a safety project to update existing signals and add pedestrian signals, crosswalks, and curb ramps. 

Gregg County  Gregg County crews will be working on bridge channel maintenance on SL 281 at Birdsong Rd. If they complete this project, the crew will then start edge maintenance on FM 449 eastbound and westbound. Traffic will be controlled by flaggers and a pilot car.

Gregg County construction projects updates:

Spur 63/McCann Road Bridge Project 

This project is part of the City of Longview Guthrie Creek Trail project. It will consist of building a bridge over Guthrie Creek to allow bicyclist and pedestrians to travel under Spur 63. The traffic will be reduced to two lanes, one northbound lane and one south bound lane to allow the contractor to build half of the bridge. Traffic will be switched later to allow completion of the bridge construction. Expect delays.

This project consists of widening a two-lane road to four lanes with a center turn lane. This includes drainage structures, flexible base, curb and gutter, sidewalks, hot mix and pavement markings.  Contractor will be extending culverts and constructing detours. There will be daytime lane closures. Expect delays.

This project consists of widening a two-lane road to four lanes with a center turn lane. This includes drainage structures, new bridge, flexible base, hot mix and pavement markings. Contractor will be extending culverts and constructing detours. There will be daytime lane closures. Expect delays.

Henderson County Athens maintenance is scheduled to blade lay hot mix on FM 1803 north from SH 31 to FM 773. A second crew will be repairing surface failures on FM 85 between SH 274 and FM 2613. Expect lane closures with flaggers controlling traffic.

Henderson County construction projects updates:

The contractor is scheduled to work on the new northbound bridge and roadway elements. Motorists should be prepared for lane closures and delays. The speed limit has been reduced to 50 mph throughout the project. The project consists of the construction of replacing bridges, approaches, grading, structures, asphalt concrete pavement (ACP) base, ACP surface, retaining walls, curb & gutter, MBGF, and pavement markings.

Rusk County Rusk County crews will be doing edge repair on US 259 from Mt. Enterprise to the county line. Expect lane closures. Crews will also be conducting sweeping operations near Kilgore.

Smith County  Tyler Maintenance will have a base failure crew on FM 3226 Monday and Tuesday, then moving out to SH 64 just outside of Chapel Hill headed east. This will be under one-way traffic worked by flaggers. A second crew will also be performing base failure work and shoulder work on US 271 just west of FM 2015 on the eastbound side. This job will be under a lane closure with traffic controlled by flaggers. A herbicide truck will also be performing duties on various roadways throughout the county.

Smith County construction projects updates:

US 271 Rehab, Turn Lanes, and Pavement Overlay 

Crews will be installing driveway culverts on the northbound and southbound sides and pavement widening operations on the northbound inside lane (turn lane). Traffic control will be managed by flaggers as needed. The project consists of paving, structures, MBGF, and pavement markings from I-20 north to the Gregg County line. The portion from I-20 to FM 16 also includes turn lanes and pavement rehabilitation.  

The contractor is scheduled for punch list items. Temporary lane closures are anticipated from 9 am to 4 pm. Drivers are encouraged to use caution as work continues on this corridor. The project will widen FM 2493 from two lanes to a four-lane divided roadway with a flush median.

The contractor is scheduled to replace damaged MBGF/end treatment at the southbound US 69 entrance ramp. Temporary lane closures will be in place during repair. The work zone speed limit is 60 mph on US 69. The project consists of building a new US 69 bridge over FM 346.

The contractor is scheduled to begin placing metal beam guard fence and continue the mill and inlay between Coffee City and FM 2868. When in progress, hours will be from 8 p.m. to 5 a.m., Sunday through Thursday nights. Expect delays. The project will resurface the roadway, upgrade drainage structures, and repair bridge joints.

Sidewalks at various locations in Smith County 

The contractor is scheduled to continue work on SH 110 in Troup. Daily lane closures are expected. The project is adding sidewalks along SH 64W in Tyler, SH 110W, and SH 135N in Troup.

No work is scheduled. The project consists of improving drainage, culvert work, and guardrail upgrades.

The contractor is scheduled to continue working on bridge repairs. When work is in progress, hours will be 9 a.m. to 4 p.m. Lane closures will be in place when working on the metal beam guard fence and retrofit rail. The project consists of bridge maintenance and repair.

This project consists of widening on ramps and exit ramps, culverts, drainage upgrades, new metal beam guard fence and bridge rails on the Barber Road overpass, and asphalt overlay.  No work this week on this project.

Tyler State Park Bridge and Resurfacing Project

No work is scheduled for this project. The project will consist of bridge and pavement resurfacing.

SH 110 & FM 346 Landscape Project 

The contractor is scheduled to continue forming various landscape development. The project consists of landscape development.

Sign Replacement at Various Locations in Smith County 

The contractor is scheduled to begin placing signs. Lane closures are possible during construction. The project will consist of replacing small roadside signs.

Whittle Street, CR 2110 and CR 289 Bridge Replacement Project 

No work is scheduled on Whittle Street at West Mud Creek Tributary. The project replaces the existing bridge with a new structure.

No work is scheduled on CR 2110 at Kickapoo Creek. The project replaces the existing bridge with a new structure. 

The contractor is scheduled to continue construction on the CR 289 bridge at Prairie Creek. The road is closed to through traffic. The project replaces the existing bridge with a new structure. The contractor will complete one bridge at a time. Weather permitting, the bridge is scheduled to be completed at the end of May.  

Van Zandt County   Canton Maintenance will be laying hot mix on FM 2339 between FM 773 and FM 1861. Flaggers will be on site to move traffic safely through the work zone. A second crew will be addressing various bridge work on FM 47. There should be no impact on traffic.

Van Zandt County construction projects updates:

I-20 MBGF Improvements (Van Zandt, Smith, and Gregg counties)

Crews will be performing bridge rail work (WB) and cleaning, grading and seeding along the shoulders of Gregg County (eastbound and westbound). Lane closures will be in effect nightly and will be managed by message boards, channelizing devices and law enforcement officers. This project is to construct safety improvements consisting of upgrading metal beam guard fence and mow strip.

SH 19 Super Two Widening & Overlay

Crews will be laying hot mix on the southbound super-two section and extending drainage structures on the northbound side. Traffic control will consist of a southbound shoulder closure and will be managed by flaggers as needed. The project consists of Super 2 work including grading, base repair, treated subgrade, flex base, OCST, PFC surface, structures, signs and pavement markings.

Bridge beams are in on CR 2708 at Caney Creek and crews will be forming the bridge deck. CR 2708 will be closed at the bridge for the remainder of construction. CR 2319 and CR 2918 are open to traffic and in the punch-list phase. Minimal impact to the traveling public is anticipated. The project consists of removing and replacing four bridges. 

Wood County  Maintenance crews are scheduled to perform blade overlay on FM 1804 between US 80 and the Sabine River. Expect lane closures and no shoulders with flaggers and a pilot vehicle controlling traffic. 

Wood County construction projects updates:

SH 37 Road Widening and PFC Overlay

Crews will be installing driveway culverts northbound. Traffic control will consist of daily shoulder closures managed with signs and truck-mounted attenuator. The project consists of base repair, level-up, spray paver, permeable friction course surface, structures, bridge rail, metal beam guard fence, and pavement markings.

The Texas Department of Transportation is responsible for maintaining 80,000 miles of road and for supporting aviation, maritime, rail, and public transportation across the state. Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.  Find out more at TxDOT.gov. "Like" us on Facebook and follow us on Twitter.