TxDOT Project Updates for the Week of Aug. 15, 2022 - EIN Presswire

2022-09-10 00:10:46 By : Ms. Victoria Ye

There were 1,657 press releases posted in the last 24 hours and 231,078 in the last 365 days.

Anderson County Palestine Maintenance crews will be performing base repair on FM 2961. Expect daytime lane closures with flaggers and a pilot car controlling traffic.

Anderson County construction projects updates:

The contractor is scheduled to continue work on final cleanup. Project consists of widening for a Super 2, including sub-grade work, surface treatment, base and surface hot mix asphalt, widening structures, bridge rail, MBGF, signage and permanent striping.

The contractor is scheduled to work on driveways and drainage structures on SH 155 in Anderson County. The speed limit is scheduled to be reduced to 60 mph throughout the project limits. Motorists should use caution when traveling through the project and expect lane closures and delays. It consists of OCST, PFC surface, shoulder texturing, edge treatment and pavement markings. 

Cherokee County Jacksonville crews will be working on blade overlay on FM 851 between Alto and FM 343. Expect daytime lane closures with flaggers and a pilot car controlling traffic. 

Rusk crews will also be working on blade overlay on FM 1247 between Wells and FM 1911. Expect daytime lane closures with flaggers and a pilot car controlling traffic.

Seal coat operations will also be taking place at these locations:

Cherokee County construction projects updates:

No work is scheduled this week. The project adds passing lanes and incorporates safety upgrades.

The contractor is scheduled to seed throughout the project. Lane closures will be in place. Expect delays on this corridor when construction is in progress. The project will widen and resurface the roadway, along with adding safety upgrades.

FM 22 Safety Widening and Bridge Replacement Project 

No work is scheduled this week. The bridge is now open to traffic. The project will widen the existing roadway, replace three bridges and incorporate safety upgrades.

The contractor is scheduled to continue road work construction on driveway upgrades and structure extensions. No lane closures are expected. The project will consist of pavement resurfacing.

No work is scheduled this week. The project is currently under time suspension due to migrating birds nesting under the bridges. The project consists of the replacement of the bridge at Mud Creek and Mud Creek Relief.

Gregg County  Longview Maintenance will be performing base repair on SH 31 eastbound between FM 3053 and FM 1639. Crews will also be performing base repair on FM 349 westbound from just east of the intersection at FM 2276. Expect lane closures with flaggers controlling traffic on both jobs.

Also, striping operations will be taking place at these locations:

Gregg County construction projects updates:

Spur 63/McCann Road Bridge Project 

This project is part of the City of Longview Guthrie Creek Trail project. It will consist of building a bridge over Guthrie Creek to allow bicyclist and pedestrians to travel under Spur 63. The traffic will be reduced to two lanes, one northbound lane and one south bound lane to allow the contractor to build half of the bridge. Traffic will be switched later to allow completion of the bridge construction. Expect delays.

This project consists of widening a two-lane road to four lanes with a center turn lane. This includes drainage structures, new bridge, flexible base, hot mix and pavement markings. Contractor will be extending culverts and constructing detours. There will be daytime lane closures. Expect delays.

This project consists of widening a two-lane road to four lanes with a center turn lane. This includes drainage structures, flexible base, curb and gutter, sidewalks, hot mix and pavement markings.  Contractor will be extending culverts and constructing detours. There will be daytime lane closures. Expect delays.

The project consists of replacing the bridge structure on Big Head Creek. Pentecost Road will be closed to through traffic. Only local traffic will be allowed. Through traffic needs to select an alternate route. Estimated completion is August of 2022.   

Henderson County Athens maintenance is scheduled to perform base repairs on FM 3062 between SH 198 and State Maintenance Ends. A second crew is scheduled to edge repair on FM 753 between SH 31 and FM 2494. Expect lane closures with flaggers controlling traffic. 

Henderson County construction projects updates:

The contractor is scheduled to work on the new northbound bridge and roadway elements. Motorists should be prepared for lane closures and delays. The speed limit has been reduced to 50 mph throughout the project. The project consists of the construction of replacing bridges, approaches, grading, structures, asphalt concrete pavement (ACP) base, ACP surface, retaining walls, curb & gutter, MBGF, and pavement markings.

The contractor is scheduled to work on sidewalks and roadway elements. Motorists should be prepared for lane closures and delays. The project includes traffic signals, curb ramps and pavement markings.

Texas Parks & Wildlife Resurface Project 

The contractor is scheduled to work on the final cleanup of the parking areas in the fishery and intersection with FM 2495 in Henderson County. The project consists of OCST and pavement markings. 

Rusk County Henderson crews will seal coat on FM 840. Expect lane closures with flaggers controlling traffic. 

Also, seal coat operations will take place this week at the following locations in Rusk County:

Also, striping operations will be taking place at these locations in Rusk County:

Smith County  Tyler Maintenance will have a base failure crew on FM 3271 just off of SH 110. This will be under flagging operation. Also, a sweeper and herbicide unit will be in various locations throughout the county.

Also, striping operations will be taking place at these locations:

Smith County construction projects updates:

Sidewalks at Various Locations in Smith County 

The contractor is scheduled to complete punch list items. Lane closures are anticipated. The project consists of sidewalk construction along SH 64 west in Tyler, SH 110 west in Troup and SH 135 north in Troup.

No work is scheduled this week. The project consists of improving drainage, culvert work, and guardrail upgrades.

The contractor is scheduled to continue seal coat. Anticipate lane closures while work is in progress. When in progress, hours will be from 8 p.m. to 5 a.m., Sunday through Thursday nights. Expect delays. The project will resurface the roadway, upgrade drainage structures, and repair bridge joints.

The contractor is scheduled to complete punch list items. Lane closures are anticipated. When work is in progress, hours will be 9 a.m. to 4 p.m. The project consists of bridge maintenance and repair.

Tyler State Park Bridge and Resurfacing Project

The contractor is scheduled to continue construction on the bridge and continue cut/fill work throughout the project. The project consists of bridge and pavement resurfacing.

SH 110 & FM 346 Landscape Project 

No work is scheduled this week. The project consists of landscape development.

Whittle Street, CR 2110 and CR 289 Bridge Replacement Project 

The contractor is scheduled to begin construction on Whittle Street at West Mud Creek Tributary. The road is closed to through traffic. The project replaces the existing bridge with a new structure.

The contractor is scheduled to continue construction on the CR 2110 bridge at Kickapoo Creek. The road is closed to through traffic. The project replaces the existing bridge with a new structure. 

No work is scheduled this week on the CR 289 bridge at Prairie Creek. The road is open to traffic. The project replaces the existing bridge with a new structure. The contractor will complete one bridge at a time. Weather permitting, the bridge is scheduled to be completed at the end of May.  

The contractor is scheduled to begin 2-inch mill and inlay under overpasses. Contractor plans to begin placing PFC throughout the project. Work will be done at night, Sundays from 9 PM to 5 AM and Monday-Thursday 8 PM to 5 AM. Expect delays on this corridor when construction is in progress. Project consists of an overlay with TBPFC surface, ACP surface, planing, shoulder texturing and pavement markings.

US 271 Rehab, Turn Lanes, and Pavement Overlay 

Crews will be preparing for paving operations on the northbound rehab area and southbound inside lane. The northbound outside lane will be permanently closed with signs and channelizing devices for the affected section. No lane closures are anticipated southbound. Traffic control will be managed by flaggers as needed. The project consists of paving, structures, MBGF, and pavement markings from I-20 north to the Gregg County line. The portion from I-20 to FM 16 also includes turn lanes and pavement rehabilitation.  

This project consists of widening on ramps and exit ramps, culverts, drainage upgrades, new metal beam guard fence and bridge rails on the Barber Road overpass, and asphalt overlay.  No work this week on this project.

Safety Improvement Project (Van Zandt, Anderson, Smith and Henderson County)

The contractor is scheduled to continue final cleanup on FM 850 in Smith County. Motorists should be prepared for lane closures and delays. The project includes grading, structure work, guard rail replacement and bridge rail upgrades. 

Van Zandt County   Maintenance crews are scheduled to perform mill and inlay on SH 243, starting at SH 198 to the Kaufman County line. Expect daytime lane closures with flaggers controlling traffic. 

Van Zandt County construction projects updates:

I-20 MBGF Improvements (Van Zandt, Smith, and Gregg counties)

Project is in final inspection phase and no work is anticipated. This project is to construct safety improvements consisting of upgrading metal beam guard fence and mow strip.

SH 19 Super Two Widening & Overlay (South of Canton)

Crews will be performing roadway widening operations northbound. Traffic control will consist of a northbound shoulder closure managed by channelizing devices. The project consists of Super 2 work including grading, base repair, treated subgrade, flex base, OCST, PFC surface, structures, signs and pavement markings.

SH 19 Super Two Widening & Overlay (North of US 80)

Crews will be extending drainage structures. Traffic control will consist of a northbound shoulder closure managed by channelizing devices. The project consists of Super 2 work including grading, base repair, treated subgrade, flex base, OCST, PFC surface, structures, signs and pavement markings.

Contractor will be addressing punch list items. CR 2708 will be closed at the bridge for the remainder of construction. Minimal impact to the traveling public is anticipated. The project consists of removing and replacing four bridges. 

Wood County  Maintenance crews are scheduled to begin hot mix overlay on SH 11 east of Winnsboro to the Camp County line. Expect one lane closure with flaggers and a pilot vehicle controlling traffic. Delays are expected.

Wood County construction projects updates:

SH 37 Road Widening and PFC Overlay

Crews will be paving shoulder level-up and overlaying northbound and southbound. Traffic control will consist of daily shoulder closures managed by flaggers and a pilot car. The project consists of base repair, level-up, spray paver, permeable friction course surface, structures, bridge rail, metal beam guard fence, and pavement markings.

FM 2088, etc. MBGF Improvements in Wood County

Crews will be replacing MBGF on FM 2966 and FM 514 at three Lake Fork bridges east of Yantis. They also will be placing mowstrip at three locations on FM 17. Traffic control will consist of daily lane closures managed with flaggers. The project is for bridge maintenance consisting of MBGF and bridge retrofit rail.

EIN Presswire's priority is source transparency. We do not allow opaque clients, and our editors try to be careful about weeding out false and misleading content. As a user, if you see something we have missed, please do bring it to our attention. Your help is welcome. EIN Presswire, Everyone's Internet News Presswire™, tries to define some of the boundaries that are reasonable in today's world. Please see our Editorial Guidelines for more information.

© 1995-2022 Newsmatics Inc. dba EIN Presswire All Right Reserved.